ผู้ติดต่อของฉัน
igus® (Thailand) Co.Ltd.

1340 Soi Bangkok-Nonthaburi 30, Bangkok-Nonthaburi Rd.,

Bangsue, Bangsue

Bangkok 10800 Thailand

+66 (0)2 587 4899
+66 (0)2 587 4898

Extreme stressing from tile dust in the building material industry

Wienerberger AG, Germany

Industry: Handling in brickworks

e-chain®: 5050.40.200.0

Travel: 20 m

Speed: 1 m/s

Acceleration: 1 m/s2

Filling: approx. 7 kg/m


Strong pollution through abrasive brick dust, plant in operation since 5 years, filled among other things with CF9, Temperatures up to + 50°C, approx. 200,000 double strokes/year

Tile factories  
More on applied products here
More interesting applications from diverse areas can be found here.